HomeNewsLast Class 92 for Caledonian Sleeper back in service

Last Class 92 for Caledonian Sleeper back in service

WEEKLY NEWSLETTER SIGN UP

The last of the seven Class 92 locomotives that will haul the Caledonian Sleeper has re-entered service following a £2 million refurbishment at Wabtec’s Brush Traction facility in Loughborough.

The GB Railfreight loco, number 92006, was originally built in 1996 and last ran in 2006 before being placed into storage in France. Now, with the introduction of Mark 5 Coaches on the Caledonian Sleeper, GBRf has fully rebuilt the loco to haul trains on the Lowlander Caledonian Sleeper route between Euston and Edinburgh and Glasgow.

The Class 92 has been fitted with special Dellner couplings, improved communication equipment and power upgrades to operate the more intensive services offered on this route. Painted in Caledonian Sleeper’s ‘Midnight Teal’ livery, it will now undergo test runs before entering traffic.

John Smith, GBRf.

GBRf managing director John Smith said: “Our investment in the refurbishment of Class 92s for the new Caledonian Sleeper service means that customers will experience a reliable, state of the art, modern locomotive on their journey from London to Scotland.

“We are delighted with the work Wabtec has carried out on 92006 and we look forward to continuing our partnership to meet the growing demands in the rail freight sector.”

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisement -

Latest news

Rail engineers strike gold in sustainability school

Multidisciplinary engineering business Dyer & Butler has earned Gold level status from the Supply Chain Sustainability School (SCSS). This is the highest level of membership...

Tunnel operation takes flight with help from a helicopter

Essential work on a tunnel in the Peak District got some help from high places. Helicopters helped airlift construction materials into position as part of...

Rail review author calls for rail fares reform

Keith Williams, co-author of the Williams-Shapps Plan For Rail white paper, has urged for fares reform – arguing there has never been a better...
- Advertisement -

More news

Iconic arrows get a dash of green ahead of environmental summit

The famous National Rail double arrow has turned several shades of green ahead of the COP26 UN climate summit, which takes place in November. The...

Digital signalling for East Coast main line tested on Thameslink

A test of the digital in-cab signalling system ECTS level 2 (European Train Control System) has been carried out successfully using a Govia Thameslink...

Potential union of unions across the Atlantic

In what is a possible world’s first, London-based transport and travel union the TSSA is in talks with America's International Brotherhood of Boilermakers on...
NEWSLETTER SIGN UP