HomeBusinessIntercity disruption continues

Intercity disruption continues

WEEKLY NEWSLETTER SIGN UP

Disruption to the passenger timetable continues as the vast majority of GWR’s Class 800 intercity express fleet, and a significant number of LNER and TransPennine Express trains, have been taken off the network to undergo a full and rigorous inspection.

Checks of the Hitachi-manufactured fleet early on Saturday morning first identified cracks on part of the chassis of some trains, so the rest of the fleet was withdrawn from service so that comprehensive checks could be carried out.

Hitachi Rail issued a statement: “Inspection has identified cracks on the lifting points under the carriage of some Class 800 trains overnight. Safety is our number one priority and, as a precaution, the decision was taken to halt the entry into service of our intercity fleets pending inspection.

“We understand the frustration caused and we would like to apologise for the inconvenience caused to passengers and operators.

“Having been cleared for service, some trains are now running again across the network. We are working as quickly and safely as possible to investigate the issue across the remainder of the fleets.”

Chris Heaton-Harris, Rail Minister.

To combat the expected continued delays, Rail Minister Chris Heaton-Harris has requested a comprehensive plan from Hitachi to identify the extent of the cracking and whether carriages can still run safely with them. He said: “Today I have directed the rail industry to urgently set out a comprehensive plan to ensure services can safely resume as soon as possible.

“I expect operators to explore all options for replacement services to help people complete their journeys, and have asked Hitachi for a safety inspection plan, as well as longer term repair strategy.

“Our focus is to ensure trains are returned to service as quickly as possible, once they are fully approved as safe. Only then can we start to rebuild a reliable and punctual timetable for passengers.

“I also want to thank passengers for their patience during what could be a significant period of prolonged disruption, likely to continue for some time.”

2 COMMENTS

  1. Buy cheep Japanese Trains get problems: Should have stuck with Bombardier with a proven track record

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisement -

Latest news

Rail engineers strike gold in sustainability school

Multidisciplinary engineering business Dyer & Butler has earned Gold level status from the Supply Chain Sustainability School (SCSS). This is the highest level of membership...

Tunnel operation takes flight with help from a helicopter

Essential work on a tunnel in the Peak District got some help from high places. Helicopters helped airlift construction materials into position as part of...

Rail review author calls for rail fares reform

Keith Williams, co-author of the Williams-Shapps Plan For Rail white paper, has urged for fares reform – arguing there has never been a better...
- Advertisement -

More news

Iconic arrows get a dash of green ahead of environmental summit

The famous National Rail double arrow has turned several shades of green ahead of the COP26 UN climate summit, which takes place in November. The...

Digital signalling for East Coast main line tested on Thameslink

A test of the digital in-cab signalling system ECTS level 2 (European Train Control System) has been carried out successfully using a Govia Thameslink...

Potential union of unions across the Atlantic

In what is a possible world’s first, London-based transport and travel union the TSSA is in talks with America's International Brotherhood of Boilermakers on...
NEWSLETTER SIGN UP