HomeInfrastructureEast Suffolk line to close for a weekend in March

East Suffolk line to close for a weekend in March

WEEKLY NEWSLETTER SIGN UP

Replacing timbers on a railway bridge over the River Deben in Suffolk will close for East Suffolk line for the weekend of 6/7 March 2021.

The wheel timbers, which support the track across the bridge, need to be replaced before their deteriorating condition necessitates a speed restriction being imposed.

Ellie Burrows, Network Rail.

Six timbers in total (three pairs) will be replaced as part of the work, which cannot be carried out while services are running.

Ellie Burrows, Network Rail’s route director for Anglia, said: “Running a safe and reliable railway is my absolute priority, and this work is essential to prevent delays and cancellations on the East Suffolk line. I’d like to thank passengers for their patience while this work takes place.”

The work will affect services between Ipswich and Saxmundham stations and rail replacement bus services will be in operation all weekend.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisement -

Latest news

Rail engineers strike gold in sustainability school

Multidisciplinary engineering business Dyer & Butler has earned Gold level status from the Supply Chain Sustainability School (SCSS). This is the highest level of membership...

Tunnel operation takes flight with help from a helicopter

Essential work on a tunnel in the Peak District got some help from high places. Helicopters helped airlift construction materials into position as part of...

Island Line to re-open this autumn

South Western Railway has said that the Island Line is set to reopen on 1 November. The upgraded line’s reopening is subject to a final...
- Advertisement -

More news

Rail review author calls for rail fares reform

Keith Williams, co-author of the Williams-Shapps Plan For Rail white paper, has urged for fares reform – arguing there has never been a better...

Iconic arrows get a dash of green ahead of environmental summit

The famous National Rail double arrow has turned several shades of green ahead of the COP26 UN climate summit, which takes place in November. The...

Digital signalling for East Coast main line tested on Thameslink

A test of the digital in-cab signalling system ECTS level 2 (European Train Control System) has been carried out successfully using a Govia Thameslink...
NEWSLETTER SIGN UP