HomeInfrastructureFirst designs for HS2’s Oxford Canal viaduct revealed

First designs for HS2’s Oxford Canal viaduct revealed

WEEKLY NEWSLETTER SIGN UP

The first images of HS2’s planned Oxford Canal viaduct, between Banbury and Daventry, show three prestressed concrete spans, set low in the landscape, that will take the railway 62.5 metres across the canal, towpath and a country lane near the village of Wormleighton.

The viaduct is one of 15 viaducts and bridges across the central section of the HS2 route that are being designed by HS2’s main works contractor EKFB (Eiffage, Kier, Ferrovial and Bam Nuttall) working with architects Moxon and design partners ASC (Arcadis, Setec and Cowi).

Opened in stages between 1774 and 1790, the 75-mile-long Oxford Canal is one of the oldest in Britain and brought coal from the Coventry coalfields to Oxford and the River Thames. The new viaduct has been designed to be as open as possible, to improve the environment for boaters and walkers and allow views across the landscape and the horizon.

The design combines a simple overall form with a special focus on materials for the parts of the structure that are close to the canal and its visitors. Rough-cut masonry features in the design where it faces onto the canal and towpath. This is to give a sense of design continuity and as a nod to architectural heritage of the canal.

Janice McKenna, EKFB.

EKFB technical director Janice McKenna said: “We were given the challenge of designing a structure that would sit as lightly as possible above the canal, while being low enough to protect views across the countryside.

“That’s why we came up with the idea of lengthening the span over the canal to bring in light, while keeping the continuity of the towpath and using the same kind of rough-cut masonry that is such a feature of the existing canal bridges. I hope the community like the designs and look forward to hearing their views.”

HS2 has launched an online design engagement event to gather feedback from the community. One of the key questions is whether the masonry finish used on the wall in front of the abutment should also be extended to the two sets of piers that support the structure.

Ambrose McGuire, HS2.

HS2 project client director Ambrose McGuire said: “The Oxford Canal viaduct is one of eight key design elements on the central section of the HS2 route and I’m pleased to see the amount of thought that’s been put into the design. The building of the canals revolutionised transportation and helped to build modern Britain so it’s great to see how our contemporary design includes a nod back to those eighteenth-century pioneers.

“We’re keen to hear what the community has to say and I would encourage anyone with an interest in the bridge to have a look at the designs and let us know their views.”

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisement -

Latest news

Boost for regional transport in upcoming budget

It looks likely that Chancellor Rishi Sunak will announce a £5.7 billion investment into sustainable transport settlements for city regions in his Autumn Budget...

TSSA members vote to accept ScotRail pay offer

The TSSA has called off its dispute with ScotRail, with its members having voted to accept a new pay offer. The TSSA says the offer...

Passengers give rail a thumbs up in latest survey

Nearly ninety per cent of rail passengers said they were satisfied with their last journey, according to a new survey by watchdog Transport Focus. The...
- Advertisement -

More news

Rail museum holds consultation on major plans

The National Railway Museum will house a consultation on plans for a new Central Hall as part of its vision as the cultural heart...

TfL bodycam video results in assault conviction

Uxbridge Magistrates have sentenced a woman to a 12-month community order and 35 rehabilitation activity requirement days following a physical assault on two Transport...

Laing O’Rourke ‘well positioned’ by FY21 results

Laing O’Rourke says its latest earnings show it is continuing to “deliver certainty and technical excellence for clients and stakeholders” and that it is...
NEWSLETTER SIGN UP