HomeInfrastructureNew footbridge goes in at Cobham, Kent

New footbridge goes in at Cobham, Kent

WEEKLY NEWSLETTER SIGN UP

A new footbridge has been installed at Cobham, Kent, on the Chatham main line between Sole Street and Rochester stations. The line connects London Victoria with Dover Priory and Ramsgate via Medway.

The replacement of an older structure by a new footbridge, which spans two third-rail electrified lines, was delivered by the Sussex-based rail team of multi-disciplinary engineering specialist Dyer & Butler. The project forms part of a package of structures work being undertaken by Dyer & Butler across the Southern region on behalf of Network Rail during Control Period 6 (CP6 – 2019-2024).

Although now replaced, the old bridge still serves a purpose. A section of it has been relocated to Dyer & Butler’s maintenance yard and will be used to train teams on refurbishment methods and structural interventions, particularly on how to use modern materials to extend the life of historic railway infrastructure.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisement -

Latest news

TSSA members vote to accept ScotRail pay offer

The TSSA has called off its dispute with ScotRail, with its members having voted to accept a new pay offer. The TSSA says the offer...

Passengers give rail a thumbs up in latest survey

Nearly ninety per cent of rail passengers said they were satisfied with their last journey, according to a new survey by watchdog Transport Focus. The...

Rail museum holds consultation on major plans

The National Railway Museum will house a consultation on plans for a new Central Hall as part of its vision as the cultural heart...
- Advertisement -

More news

TfL bodycam video results in assault conviction

Uxbridge Magistrates have sentenced a woman to a 12-month community order and 35 rehabilitation activity requirement days following a physical assault on two Transport...

Improvements carried out on major London route

A revamp of 1980s signalling systems over the weekend saw services stopped temporarily between London Victoria and East Croydon. Trains were diverted to London Bridge...

Northern takes control of major rail facility

Northern has confirmed it now has full control of Neville Hill depot in Leeds. Previously, the depot – along with its 550-strong staff of engineers,...
NEWSLETTER SIGN UP