HomeInfrastructureFirst train runs the length of London’s Northern Line Extension

First train runs the length of London’s Northern Line Extension

WEEKLY NEWSLETTER SIGN UP

The new Northern Line Extension to London’s underground network reached a significant milestone as an engineering train travelled the entire 3.2km length of the new tunnels, from Kennington to Battersea, for the first time.

Entering the new tunnels at Kennington station, the battery-powered train travelled through the newly constructed step-plate junction, which connects the existing Northern line tunnels to the extension. It then continued through the new Nine Elms tube station before terminating at the extension’s second new station, at Battersea. 

The train carried 750 metres of power cable, which was then installed by 15 engineers.

Installing power cables in the Northern Line Extension tunnels. (TfL)

Running this train along the full length of the Northern Line Extension marks the completion of the tunnels and track work. Attention now moves to focus on the fit-out of the new stations, installing the power supply and extending the signalling system into the extension.

This extension, which is expected to be completed in September 2021, is the first major extension to the tube network since the Jubilee line in the late 1990s.

TfL’s director of major projects Stuart Harvey said: “Running a train through the new section of railway tunnel is an exciting moment and demonstrates the hard work of hundreds of men and women who are working around the clock to build the first new Tube extension in two decades. The Northern Line Extension will support jobs, homes and growth in one of the most exciting new destinations in London, help keep pace with the capital’s rising population, and is creating jobs through the supply chain across the UK.”

The extension will mean that residents of Battersea and its surrounding areas are within 15 minutes of the West End and City. In addition to the benefits this will bring, construction of the extension is boosting the UK economy and supporting around 1,000 jobs, including 50 apprenticeships.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisement -

Latest news

Improvements carried out on major London route

A revamp of 1980s signalling systems over the weekend saw services stopped temporarily between London Victoria and East Croydon. Trains were diverted to London Bridge...

Northern takes control of major rail facility

Northern has confirmed it now has full control of Neville Hill depot in Leeds. Previously, the depot – along with its 550-strong staff of engineers,...

HS2 trains to be built in UK – but by whom?

German train maker Siemens has launched a legal challenge to HS2 awarding its rolling stock contract to a joint venture of Hitachi Rail and...
- Advertisement -

More news

Operator appeals for more considered use of emergency alarms

Passengers hitting the emergency alarms have cause 17 hours of delay in only half a year for one operator. From 1 April to 4 September...

Rail safety cyber security expert lands professor role

Rail safety cyber security specialist Dr Emma Taylor has taken up the role of visiting professor at Cranfield University. The appointment involves lecturing in the...

Night Tube set to return next month

After being suspended because of the pandemic, Transport for London (TfL) has said that the Night Tube is set to make a comeback in...
NEWSLETTER SIGN UP